ARRANGEMENT OF ARTICLES
|
| |
|
| |
I, Martin Cullen, Minister for Transport, in exercise of the powers conferred on me by section 43 of the Transport (Railway Infrastructure) Act 2001 (No. 55 of 2001), having considered an application by Córas Iompair Éireann for a railway order to authorise railway works affecting the railway line between Glounthaune and Midleton in the County of Cork, the draft order, the plans of the proposed railway works and the book of reference to those plans and the schedules to the draft order, the Environmental Impact Statement that accompanied the application, the Report of the Public Inquiry duly held and the recommendations contained therein, any submissions duly made to me under section 40 or section 41 of that Act and not withdrawn, and being of opinion that the application should be granted and being also of the opinion that the rights in, over or under public roads specified in this Order with the consent of the Minister for the Environment, Heritage and Local Government are necessary for giving effect to this Order, hereby order as follows:
|
| |
PART 1
Preliminary
|
|
Citation.
|
1. This Order may be cited as the Railway (Glounthaune to Midleton) Order 2007.
|
|
Definitions.
|
2. In this Order -
|
| |
“construct” includes build, make, put together, erect, create, form and assemble;
|
| |
“deposited plan” means the copy of the plan deposited together with this Order pursuant to section 46 of the Principal Act, being the plan of the proposed railway works submitted to the Minister pursuant to section 37 (2) of the Principal Act, together with —
|
| |
(a) all other plans so submitted, and
|
| |
(b) all other plans referred to in the report of the public inquiry held under section 42 of the Principal Act,
|
| |
and a reference to a plan by a particular designation is a reference to the plan so designated that is so deposited;
|
| |
“execute” includes construct, maintain and improve;
|
| |
“maintain” includes inspect, repair, adjust, alter, remove, reconstruct, renew and replace;
|
| |
“Minister” means the Minister for Transport;
|
| |
“Principal Act” means the Transport (Railway Infrastructure) Act 2001;
|
| |
“public road” has the meaning assigned to it by the Roads Act 1993 but also includes any road which becomes such a public road during the currency of this Order;
|
| |
“railway” means a railway or part of a railway for which railway works are authorised by this Order;
|
| |
“railway undertaking” means Córas Iompair Éireann or, where the context so requires or admits, a person with whom Córas Iompair Éireann has made an arrangement pursuant to section 43 (6) of the Principal Act;
|
| |
“reconstruct” means wholly or partly rebuild, repair, restore, replace or alter;
|
| |
“road” has the meaning assigned to it by the Roads Act 1993 and includes a bridge;
|
| |
“relevant road authority”, in relation to an existing public road or a proposed public road means the road authority, within the meaning of the Roads Act 1993, within whose functional area the existing road is situated or the proposed road is to be constructed;
|
| |
“substratum of land” means any subsoil or anything beneath the surface of the land required for any purpose connected with the works authorised by this Order;
|
| |
“works” includes railway works as defined in the Principal Act but also includes, where the context so requires or admits, other works authorised by this Order including such acts or operations as are included in the meaning assigned to “works” in the definition of “railway works” in the Principal Act.
|
|
Incorporation of enactments.
|
3.—(1) The Regulation of Railways Acts 1840 to 1889 and any other Act relating to railways apply to the railway works authorised by this Order so far as they are applicable for the purposes of, and are not inconsistent with or varied by, this Order, and the Principal Act together with this Order constitute the Special Act for the purposes of those enactments.
|
| |
PART 2
Works and Related Provisions
|
|
Construction of railway and railway works.
|
4.—(1) Subject to the Principal Act and this Order (including, in particular, the condition in paragraph (3)), the railway undertaking may on the lines, in the places and according to the levels shown on the deposited plan, construct, operate, improve and maintain the railway and railway works specified in Schedule 1 and all other works and things necessary or ancillary thereto.
|
| |
(2) Construction of the works authorised by this Order shall be completed within the period of 7 years from the date this Order comes into force or within such further period as the Minister allows on the application of Córas Iompair Éireann.
|
| |
(3) The railway works authorised by this Order shall be executed, and the railway shall be operated, in accordance with the understandings reached at the public inquiry, as set out in Schedule 11.
|
| |
(4) Paragraph (2) does not apply to any works required for the operation or maintenance of the railway works authorised by this Order.
|
| |
(5) The railway may be operated by electrical or any other form of mechanical power.
|
|
Discharge of water.
|
5.—(1) Subject to paragraphs (2) and (3), the railway undertaking may —
|
| |
(a) alter the level or the course of, or use for the drainage of water, any surface watercourse, sewer or drain, and
|
| |
(b) construct, provide and use any underground or overground tanks or pipes to assist in such drainage,
|
| |
in connection with the construction, maintenance or operation of the railway works and for that purpose, may make any convenient connections with any such surface watercourse, sewer or drain.
|
| |
(2) The railway undertaking —
|
| |
(a) shall not discharge any water into, or interfere with, any surface watercourse, sewer or drain except —
|
| |
(i) with the consent of the sanitary or other authority responsible for that surface watercourse, sewer or drain, which consent shall not be unreasonably withheld or delayed, and
|
| |
(ii) in accordance with such terms and conditions as that authority reasonably imposes, and
|
| |
(b) shall take such steps as are reasonably practicable to ensure that any water discharged into any such surface watercourse, sewer or drain under the powers conferred on the railway undertaking by this Article is free from soil or polluting or deleterious material.
|
| |
(3) Any dispute that arises in relation to any of the provisions of this Article between the railway undertaking and a sanitary or other authority shall be referred to arbitration in accordance with Article 17.
|
|
Deviation.
|
6. In constructing and maintaining any of the railway works authorised by this Order, the railway undertaking may —
|
| |
(a) deviate horizontally from the line delineated on the deposited plans to any extent not exceeding the limits of deviation delineated on those plans, and
|
| |
(b) deviate vertically from the levels shown on the deposited plans to any extent not exceeding one metre upwards or downwards.
|
|
Closure of roads — permanent and temporary.
|
7.—(1) The railway undertaking may, for the purpose of executing the railway works authorised by this Order or for any purpose incidental thereto, from time to time request the relevant road authority by order—
|
| |
(a) to permanently close to traffic the roads specified in Schedule 3, and
|
| |
(b) to temporarily close to traffic any one or more of the public roads specified in Schedule 4.
|
| |
(2) The following provisions apply in relation to each request under paragraph (1):
|
| |
(a) the railway undertaking shall give to the road authority not less than 21 days' prior notice in writing, specifying the road which is required to be closed, of its requirement to close the road;
|
| |
(b) if the request is to temporarily close a road, the notice shall —
|
| |
(i) state the period for which, in the reasonable opinion of the railway undertaking, it is necessary to temporarily close the road,
|
| |
(ii) give particulars of any alternative route or routes (if any) which the railway undertaking believes will be available while the road is temporarily closed,
|
| |
(iii) contain a brief description of the works which the railway undertaking proposes to carry out while the road is temporarily closed, and
|
| |
(iv) state whether the order closing the road is required to be subject to conditions as to whether any, and if so, what traffic or persons may be allowed use the road and at what times and on what conditions (if any).
|
| |
(3) A request made to a road authority under this Article shall not be unreasonably refused or delayed.
|
|
Power to alter public roads.
|
8.—(1) Subject to paragraph (2), the railway undertaking may, in connection with or for the purpose of railway works in or adjacent to any public road and in accordance with the deposited plans —
|
| |
(a) alter the width of the carriageway of the road by altering the width of any footway, cycle track, verge or other land within the boundary of the road,
|
| |
(b) alter or interfere with the level of any kerb, footway, cycleway, verge or other land within the boundary of the road, or
|
| |
(c) realign the road where necessary.
|
| |
(2) Before exercising any power under paragraph (1), the railway undertaking shall obtain the consent of the relevant road authority, which consent shall not be unreasonably withheld or delayed.
|
| |
(3) The works authorised by this Article may be constructed and maintained in upon and under the public roads specified in Schedule 5.
|
|
Construction of new roads and bridges.
|
9.—(1) The railway undertaking may, with the consent of the relevant road authority, construct the new roads specified in Schedule 6 with all necessary works connected therewith either by way of diversion from, or in substitution for, an existing public road or as an additional road.
|
| |
(2) Unless otherwise agreed between the railway undertaking and the road authority, each new road constructed under this Article shall when completed, be maintained —
|
| |
(a) for the period of 12 months from the date of its completion, by and at the expense of the railway undertaking, and
|
| |
(b) from the expiration of that period, by and at the expense of the road authority.
|
| |
(3) Any dispute that arises between the railway undertaking and the road authority in relation to anything done under this Article shall be referred to arbitration in accordance with Article 17.
|
| |
(4) Wherever the railway undertaking is authorised by this Order to construct a bridge to carry a railway over any road, motor way or water way or to carry any road over a railway, the following provisions apply in relation to the construction and maintenance of that bridge:
|
| |
(a) subject to subparagraph (b), the bridge shall be maintained by the railway undertaking at its own expense;
|
| |
(b) where the bridge carries a road, the railway undertaking and the relevant road authority may enter into agreements on such terms as are agreed between them for the maintenance, improvement or relaying of the road surface, whether by the railway undertaking, by a contractor employed by the railway undertaking for that purpose, by the road authority or by any contractor employed by the road authority.
|
|
Tree lopping.
|
10.—(1) The railway undertaking may lop, remove or cut any tree, shrub or hedge that obstructs or interferes with any railway works authorised by this Order.
|
| |
(2) With regard to paragraph (1), where a tree, shrub or hedge lies on land not owned by the railway undertaking and for the purpose of works authorised by this Order needs to be lopped or cut, the railway undertaking shall serve on the owner or occupier of the land or, in the case of a public road, on the road authority charged with the maintenance of the road, on which the tree, shrub or hedge is standing, notice in writing of its intention so to lop or cut, and, after the expiration of 28 days from the date of service of the notice, the railway undertaking may lop or cut any tree, shrub or hedge if the owner or occupier has not already done so.
|
| |
(3) Where an occupier or owner of land cuts or lops any tree, shrub or hedge specified in a notice given under paragraph (2), the reasonable expenses (if any) incurred by him or her in so doing shall be paid to him or her on demand by the railway undertaking, and the amount of those expenses is recoverable from the railway undertaking, in default of agreement, as a simple contract debt in any court of competent jurisdiction.
|
| |
PART 3
Acquisition and Possession of Land and Rights
|
|
Power to acquire land.
|
11.—(1) Subject to the Principal Act, the railway undertaking may acquire compulsorily all or such part of the land and any substratum of land shown on the deposited plan and described in Schedule 2 and such rights in, under or over land described in Schedule 7 as the railway undertaking may require for the construction operation, improvement and maintenance of the railway works authorised by this Order and works incidental or ancillary thereto.
|
| |
(2) Sections 4 and 8 of the Railways Act 1851 do not apply in relation to the acquisition of any land under this Article.
|
|
Power to temporarily acquire and occupy land.
|
12.—(1) Subject to the Principal Act, the railway undertaking may enter upon and take up and retain temporary possession and occupation of the land, or any part of the land, shown on the deposited plan and specified in Schedule 10.
|
| |
(2) In particular, but without limiting the generality of paragraph (1), the railway undertaking may—
|
| |
(a) enter upon, and take up and retain temporary possession and occupation of the land or any part of the land —
|
| |
(i) for the provision of working sites and access for construction purposes or
|
| |
(ii) for other purposes for or in connection with the railway works authorised by this Order, and
|
| |
(b) for those purposes —
|
| |
(i) construct structures on, or remove structures from, the land,
|
| |
(ii) cut or remove anything growing on the land or part thereof, and
|
| |
(iii) generally do all things to, on, beneath and with the land that are required to adapt the land and anything on it for, or to facilitate the execution of, those works.
|
| |
(3) Before giving up possession of the land, the railway undertaking shall —
|
| |
(a) remove all temporary works and structures constructed by it on the land, and
|
| |
(b) subject to any contrary provision of this Order or any agreement to the contrary with the owners and occupiers of the land, restore the land as far as possible to its former state.
|
| |
(4) The railway undertaking shall not be required to acquire any land of which temporary possession and occupation have been taken up under this Article.
|
| |
(5) The railway undertaking shall pay to the owners and occupiers of land of which it takes up temporary possession and occupation under this Article compensation for any loss thereby suffered as if that loss were loss suffered in consequence of the exercise by the railway undertaking of a power conferred upon it by section 48 of the Principal Act, and the amount of the compensation shall be determined in accordance with that section.
|
|
Acquisition of easements and other rights over land.
|
13. Subject to the Principal Act, the railway undertaking may acquire compulsorily such rights over all or part of the land described in Schedule 7 as are required for the purposes of the railway or the railway works authorised by this Order.
|
|
Extinguishment of rights, including rights of way, and temporary interference with rights.
|
14.—(1) The railway undertaking may extinguish the public rights, including the rights of way, specified in Part 1 of Schedule 8.
|
| |
(2) The railway undertaking may extinguish the private rights, including the rights of way, specified in Part 2 of Schedule 8.
|
| |
(3) The railway undertaking may temporarily interfere with or stop up the rights of way specified in Schedule 9.
|
|
Period within which the railway undertaking may compulsorily acquire land and interests in land.
|
15.—(1) The powers conferred by this Order to compulsorily acquire land or rights in relation to land and to enter upon and take up temporary possession of land cease at the end of the period of 7 years beginning on the commencement of this Order.
|
| |
(2) The power to compulsorily acquire land or rights in relation to land shall, for the purpose of this Article, be deemed to have been exercised where a notice to treat has been served in respect of the land or rights before the end of the period mentioned in paragraph (1).
|
| |
(3) Notwithstanding paragraph (1), the railway undertaking is entitled to remain in temporary possession and occupation of land pursuant to Article 12 after the end of the period mentioned in paragraph (1) where possession of that land was taken before the end of that period.
|
| |
PART 4
Miscellaneous and General
|
|
Interference with apparatus.
|
16.—(1) Wherever the railway undertaking is authorised to execute works by virtue of this Order, and any apparatus will or may be affected in consequence thereof the undertaker may and, upon reasonable request by the railway undertaking, shall without unreasonable delay, do one or more of the following:
|
| |
(a) remove the apparatus and place it or other apparatus in substitution for it in such other position or location as is agreed with the railway undertaking,
|
| |
(b) take such further or other steps or make such further or other provision with the agreement of the railway undertaking secures the apparatus and the works of the railway undertaking and the proper functioning of each of them respectively from mutual interference or damage.
|
| |
(2) Subject to paragraph (3), the railway undertaking shall pay to the undertaker an amount equal to the cost reasonably incurred by that undertaker in the discharge of its obligations under paragraph (1).
|
| |
(3) Where an undertaker, in the course of the discharge of its obligations under paragraph (1), provides, in substitution for existing apparatus, apparatus that, whether because of its type, construction, design, layout, placement or any other feature, is an improved or superior version of the existing apparatus, the sum payable by the railway undertaking under paragraph (2) shall not exceed the cost that would have been reasonably incurred by the undertaker if the substituted apparatus had not been an improved or superior version of the existing apparatus.
|
| |
(4) An undertaker may permit the railway undertaking to carry out or cause to be carried out such portion of the undertaker's obligations under this Article as the undertaker agrees, in accordance with such conditions as are agreed between the railway undertaking and the undertaker, but the undertaker is not obliged to enter into any such agreement.
|
| |
(5) In this Article —
|
| |
“apparatus” means any item of infrastructure (including, in particular, any sub-station inspection chamber, junction box, booster station, pipe, sewer, drain, duct, tunnel conduit, wire, cable, fibre or insulator) used for or in connection with the provision or acceptance of a service to the public;
|
| |
“undertaker, in relation to apparatus, means a person or body with power and authority independently of the operation of this Order, to locate or relocate the apparatus, or cause it to be located or relocated, as provided for in this Article.
|
|
Arbitration.
|
17.—(1) If a dispute arises between the railway undertaking and any other party in relation to the execution of railway works authorised by, or the powers or provisions granted by or contained in, this Order, the following provisions apply:
|
| |
(a) the railway undertaking and the other party shall use their best endeavours to resolve the dispute on terms acceptable to both parties;
|
| |
(b) if, after such period as the railway undertaking or the other party considers reasonable, the dispute has not been resolved to the satisfaction of both parties, the following provisions apply:
|
| |
(i) either party may, by 14 days' notice in writing to the other party require the subject-matter of the dispute to be submitted to a single arbitrator and shall, in the notice, nominate a person to arbitrate upon the subject-matter of the dispute;
|
| |
(ii) the party receiving the notice may, within that period of 14 days, by a counter-notice, either
|
| |
(I) accept the arbitrator nominated by the party serving the original notice, or
|
| |
(II) nominate at least 2 alternative persons to act as arbitrator;
|
| |
(iii) if any one of the persons nominated by the parties is acceptable to both parties to the dispute, the subject-matter of the arbitration shall be referred to that person as soon as may be after that person has indicated his or her willingness to act as arbitrator;
|
| |
(iv) if, after service of the notice and the counter-notice—
|
| |
(I) the parties fail to agree upon an arbitrator, or
|
| |
(II) an arbitrator agreed upon has failed to indicate, within 14 days of being so requested, his or her willingness to act,
|
| |
either party may apply to the Chairman for the time being of the Irish Branch of the Chartered Institute of Arbitrators for the appointment of an arbitrator;
|
| |
(v) an arbitrator so appointed by the Chairman of the Irish Branch of the Chartered Institute of Arbitrators shall notify the parties in writing of his or her appointment as soon as may be thereafter and shall conduct the arbitration in accordance with the rules of the Irish Branch of that Institute;
|
| |
(vi) the Arbitration Acts 1954 to 1980 apply to the arbitration and the decision of the arbitrator in relation to the dispute and all matters connected therewith is binding on the parties.
|
| |
SCHEDULE 1
|
|
Article 4(1)
|
The railway and railway works authorised by this Order
|
| |
The principal infrastructure elements of the Glounthaune to Midleton Railway include the following:
|
| |
- The provision of single track from Glounthaune to Midleton with a passing loop at Carrigtwohill;
|
| |
- The provision of a new signalling system from Glounthaune to Midleton;
|
| |
- The provision of new train stations at Midleton and Carrigtwohill including carparks, lifts, ramps and footbridges;
|
| |
- The construction of four new overbridges to replace level crossings;
|
| |
- The construction of one new underbridge to replace a level crossing;
|
| |
- The construction of roads to replace level crossings, provide access to the stations and private property;
|
| |
- The replacement of the existing bridge deck at the Owennacurra River;
|
| |
- The upgrading of parapets and containment at seven existing road overbridges;
|
| |
- The demolition of two existing accommodation underpasses;
|
| |
- The installation of new boundary treatment works along the rail corridor; and
|
| |
- The upgrading of existing culverts and construction of new culverts and drains.
|
| |
|
| |
SCHEDULE 2
|
|
Article 1(1)
|
Land to be acquired
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.176
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Paddy O' Reilly
|
|
|
216
|
Henchy's Bar
|
|
|
|
St. Lukes Cross
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of garden
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Bellevue Lodge, Tivoli, Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.176
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.178
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Peter and Gaye Haughton
|
|
|
63
|
The Coach House
|
|
|
|
Lower Glanmire Road
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of garden
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
The Coach House, Lower Glanmire Road,
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.178
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.179
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Dept of Communications,Marine & Natural
|
|
Port of Cork Company
|
2122
|
Resources
|
|
Custom House Street
|
|
23-31 Adelaide Road
|
|
Cork
|
|
Dublin 2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of River Lee
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Lower Glanmire Road, Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.179
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.179X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Cork City Council
|
|
|
161
|
City Hall
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of footpath
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Lower Glanmire Road, Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.179X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.182
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Woodside Apartment Management Ltd
|
|
Evelyn Montague
|
252
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 1 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Ian Anderton
|
Part of garden
|
|
|
Apartment No. 2 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
Joe Neville & Sons Limited
|
Cois Coille, Woodhill, Tivoli, Cork,
|
|
|
Apartment No. 3 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.182
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Woodside Apartment Management Ltd
|
|
Joe Neville & Sons Limited
|
252
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 4 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Paul Murphy
|
Part of garden
|
|
|
Apartment No. 5 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
Damian Jones
|
Cois Coille, Woodhill, Tivoli, Co.Cork
|
|
|
Apartment No. 6 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.182
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Woodside Apartment Management Ltd
|
|
Michael Owens
|
252
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 7 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Trish Hollywood
|
Part of garden
|
|
|
Apartment No. 8 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
Joe Neville & Sons Limited
|
Cois Coille, Woodhill, Tivoli, Cork,
|
|
|
Apartment No. 9 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.182
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Woodside Apartment Management Ltd
|
|
Joe Neville & Sons Limited
|
252
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 10 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
John P. O'Flynn
|
Part of garden
|
|
|
Apartment No. 11 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
Michael MacSweeney
|
Cois Coille,
|
|
|
Apartment No. 12 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.182X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Woodside Apartment Management Ltd
|
|
Evelyn Montague
|
134
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 1 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Ian Anderton
|
Part of car park / common areas
|
|
|
Apartment No. 2 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
Joe Neville & Sons Limited
|
Cois Coille, Woodhill, Tivoli, Cork,
|
|
|
Apartment No. 3 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.182X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.182X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Woodside Apartment Management Ltd
|
|
Joe Neville & Sons Limited
|
134
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 4 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Paul Murphy
|
Part of car park / common areas
|
|
|
Apartment No. 5 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
Damian Jones
|
Cois Coille, Woodhill, Tivoli, Cork,
|
|
|
Apartment No. 6 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.182X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.182X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Woodside Apartment Management Ltd
|
|
Michael Owens
|
134
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 7 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Trish Hollywood
|
Part of car park / common areas
|
|
|
Apartment No. 8 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
Joe Neville & Sons Limited
|
Cois Coille, Woodhill, Tivoli, Cork,
|
|
|
Apartment No. 9 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.182X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.182X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Woodside Apartment Management Ltd
|
|
Joe Neville & Sons Limited
|
134
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 10 Cois Coille, Woodhill
|
|
Kinsale
|
|
Cork Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
John P. O'Flynn
|
Part of car park / common areas
|
|
|
Apartment No. 11 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
Michael MacSweeney
|
Cois Coille, Woodhill, Tivoli, Cork,
|
|
|
Apartment No. 12 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.182X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
001
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.186
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Córas Iompair Éireann
|
|
|
606
|
Heuston Station
|
|
|
|
Dublin 8
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of garden
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Carrick House, Lower Glanmire Road, Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.P.186
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
005
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.14
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Ahern Industrial Services Ltd
|
|
|
929
|
Rock Lodge, Church Road
|
|
|
|
Carrigaline
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Killacloyne, Glounthaune, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Killacloyne
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
005.P.14
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
008
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.33
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Patrick Geaney
|
|
|
553
|
Terrysland
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Terrysland, Carrigtwohill, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Terrysland
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
Ongoing legal dispute over ownership of land
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
008.P.33
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
008
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.34
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Patrick Geaney
|
|
|
473
|
Terrysland
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Terrysland, Carrigtwohill, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Terrysland
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
Ongoing legal dispute over ownership of land
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
008.P.34
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
008
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.34X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Patrick Geaney
|
|
|
140
|
Terrysland
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field and drain
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Terrysland, Carrigtwohill, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Terrysland
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
Ongoing legal dispute over ownership of land
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
008.P.34X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
008
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.36
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Saltar Ziad
|
|
|
140
|
Terrysland
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Carrigtwohill, Co.Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Carrigtwohill
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
008.P.36
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
008
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.37
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Cork County Council
|
|
|
15775
|
County Hall
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Carrigtwohill, Co.Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Carrigtwohill
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
008.P.37
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
008
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.37X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Patrick Geaney
|
|
|
6022
|
Terrysland
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Carrigtwohill, Co.Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Carrigtwohill
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
008.P.37X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
011
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.72
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Donal and Sheila Harte
|
|
|
859
|
Carrigane
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Carrigane, Carrigtwohill, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Carrigane
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
011.P.72
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
011
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.73
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Donal and Sheila Harte
|
|
|
1611
|
Carrigane
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Carrigane, Carrigtwohill, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Carrigane
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
011.P.73
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
012
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.81
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
David Stanislaus Lawton
|
|
|
2192
|
Ballyrichard
|
|
|
|
Midleton
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Ballyrichard More, Midleton, Co.Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Ballyrichard More
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
012.P.81
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
012
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.84
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
David Stanislaus Lawton
|
|
|
1366
|
Ballyrichard
|
|
|
|
Midleton
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Ballyrichard More, Midleton, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Ballyrichard More
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
012.P.84
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
012
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.84X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
John Denis Anthony O' Mahony
|
|
|
1951
|
Ballyrichard
|
|
|
|
Midleton
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Ballyrichard More, Midleton, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Ballyrichard More
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
012.P.84X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
012
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.84Y
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Seamus Geaney
|
|
|
1051
|
Terrysland
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Water-rock, Midleton, Co.Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Water-rock
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
012.P.84Y
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
012
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.85X
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Seamus Geaney
|
|
|
2527
|
Terrysland
|
|
|
|
Carrigtwohill
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Water-rock, Midleton, Co.Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Water-rock
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
012.P.85X
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
014
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.101
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Pat O'Neill
|
|
|
241
|
Mill Road
|
|
|
|
Midleton
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of cottage and yard
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Townparks, Mill Road, Midleton, Co.Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Townparks
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
014.P.101
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
014
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.105
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Midleton Urban District Council
|
|
|
2062
|
Midleton Lodge, Youghal Road
|
|
|
|
Midleton
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of public open area
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Townparks/Broomfield West, Midleton,
|
|
|
|
Co.Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Townparks/Broomfield West
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
014.P.105
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 2
|
Property Plan
|
|
014
|
|
Land to be acquired
|
|
|
|
|
|
Property Number
|
|
P.106
|
|
|
|
|
|
|
|
| |
|
| |
Quantity, description and situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Quantity (sq.m.)
|
Jim Linehan
|
|
|
687
|
The Railway Inn, Mill Road
|
|
|
|
Midleton
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Part of yard and she
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
|
|
Townparks, Mill Road, Midleton, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Townparks
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
014.P.106
|
|
|
|
|
|
|
|
|
| |
|
| |
SCHEDULE 3
|
|
Article 7(1)
|
Roads to be closed permanently
|
| |
Location
|
As shown on plan numbers:
|
|
|
None
|
None
|
|
|
|
|
|
| |
|
| |
SCHEDULE 4
|
|
Article 7(1)
|
Roads to be closed temporarily
|
| |
Location
|
As shown on plan numbers:
|
|
|
Road immediately North-West of XY001 - Harpers Island level crossing. (Old N25)
|
B003, A005
|
|
|
The old N25 Bridge that crosses the Railway - Over Bridge 1
|
B004, A006
|
|
|
Road at Killacloyne Bridge (north of Killacloyne cross roads)-Over Bridge 2
|
B005, A006
|
|
|
Road at Wise's Bridge, Terrysland - Over Bridge 4
|
B007, A007
|
|
|
Station Road Carrigtwohill, Barry's Bridge - Over Bridge 6
|
B009, A008
|
|
|
Carrigtwohill Station Road in front of Parochial House
|
S002, S003
|
|
|
Road at Ballyadam Bridge, Ballyadam - Over Bridge 7
|
B010, A010
|
|
|
Ballyrichardmore lane, from north side of existing level crossing to west end of proposed link road.
|
R002, A012
|
|
|
Road north & south of Water rock level crossing - (south-east of Water Rock house) - XY009
|
C001, A013
|
|
|
Road north and south of Kennels level crossing - Road to Kennels industrial estate - XY011
|
C003, A013
|
|
|
Road north & south of Mill Road level crossing, Midleton - XY012
|
C004, A014
|
|
|
Mc Sweeney Terrace/Railway street, Midleton
|
S005
|
|
|
Entrance roadway to Forrest Hill, Midleton
|
S006
|
|
| |
|
| |
SCHEDULE 5
|
|
Article 8(3)
|
Roads to be altered
|
| |
Location
|
As shown on plan numbers:
|
|
|
Road immediately North-West of XY001 - Harpers Island level crossing. (Old N25)
|
B003, A005
|
|
|
The old N25 Bridge that crosses the Railway - Over Bridge 1
|
B004, A006
|
|
|
Road at Killacloyne Bridge (north of Killacloyne cross roads) - Over Bridge 2
|
B005, A006
|
|
|
Road at Wise's Bridge, Terrysland - Over Bridge 4
|
B007, A007
|
|
|
Station Road Carrigtwohill, Barry's Bridge - Over Bridge 6
|
B009, A008
|
|
|
Carrigtwohill Station Road in front of Parochial House
|
S002, S003
|
|
|
Road at Ballyadam Bridge, Ballyadam - Over Bridge 7
|
B010, A010
|
|
|
Ballyrichardmore lane, from north side of existing level crossing to west end of proposed link road.
|
R002, A012
|
|
|
Road north & south of Water rock level crossing - (south-east of Water Rock house) - XY009
|
C001, A013
|
|
|
Road north and south of Kennels level crossing - Road to Kennels industrial estate - XY011
|
C003, A013
|
|
|
Road north & south of Mill Road level crossing, Midleton - XY012
|
C004, A014
|
|
|
Mc Sweeney Terrace/Railway street, Midleton
|
S005
|
|
|
Entrance roadway to Forrest Hill, Midleton
|
S006
|
|
|
Junction of McSweeney Terrance/Railway Street and Mill Road, Midleton
|
S005
|
|
|
Lower Glanmire road (N8) in front of Myrtlehill Terrace, Bellevue villas & Woodhill Villas
|
B001, B002, A001, A002, A003
|
|
|
Access road from Lower Glanmire road (N8) to Cois Coill
|
B001, B002, A001, A002, A003
|
|
| |
|
| |
SCHEDULE 6
|
|
Article 9(1)
|
New roads to be constructed
|
| |
Location
|
As shown on plan numbers:
|
|
|
Carrigtwohill Station access road
|
S002, S003
|
|
|
Link road from Ballyrichardmore lane to Water rock road
|
R002
|
|
|
Access to property east of proposed north car park at Midleton Station
|
S005
|
|
|
Midleton Station access road from Forrest Hill to Proposed north car park
|
S005, S006
|
|
|
Access road to Woodhill Villas
|
B001, B002, A001, A002, A003
|
|
|
Myrtlehill Terrace & Bellevue Villas access road
|
B001, B002, A001, A002, A003
|
|
| |
|
| |
SCHEDULE 7
|
|
Article 11(1)
,
Article 13
|
Land over which rights including rights of way and other rights and easements are to be acquired.
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 7
|
Property Plan
|
|
001
|
|
Land over which rights including rights of way and other rights and easements are to be
|
|
|
|
|
acquired
|
Property Number
|
|
R.182
|
|
|
|
|
|
|
|
| |
Situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Situation
|
Woodside Apartment Management Ltd
|
|
Evelyn Montague
|
Woodhill, Tivoli, Cork
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 1 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Ian Anderton
|
Right of way to new access road
|
|
|
Apartment No. 2 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
Joe Neville & Sons Limited
|
Cork City
|
|
|
Apartment No. 3 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
New access to Woodhill Villas
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.R.182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 7
|
Property Plan
|
|
001
|
|
Land over which rights including rights of way and other rights and easements are to be
|
|
|
|
|
acquired
|
Property Number
|
|
R.182
|
|
|
|
|
|
|
|
| |
Situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Situation
|
Woodside Apartment Management Ltd
|
|
Joe Neville & Sons Limited
|
Woodhill, Tivoli, Cork
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 4 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Paul Murphy
|
Rights of way to new access road
|
|
|
Apartment No. 5 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
Damian Jones
|
Cork City
|
|
|
Apartment No. 6 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
New access to Woodhill Villas
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.R.182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 7
|
Property Plan
|
|
001
|
|
Land over which rights including rights of way and other rights and easements are to be
|
|
|
|
|
acquired
|
Property Number
|
|
R.182
|
|
|
|
|
|
|
|
| |
Situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Situation
|
Woodside Apartment Management Ltd
|
|
Michael Owens
|
Woodhill, Tivoli, Cork
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 7 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
Trish Hollywood
|
Right of way to new access road
|
|
|
Apartment No. 8 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
Joe Neville & Sons Limited
|
Cork City
|
|
|
Apartment No. 9 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
New access to Woodhill Villas
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.R.182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 7
|
Property Plan
|
|
001
|
|
Land over which rights including rights of way and other rights and easements are to be
|
|
|
|
|
acquired
|
Property Number
|
|
R.182
|
|
|
|
|
|
|
|
| |
Situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Situation
|
Woodside Apartment Management Ltd
|
|
Joe Neville & Sons Limited
|
Woodhill, Tivoli, Cork
|
Tisaxon Lodge, Tisaxon,
|
|
Apartment No. 10 Cois Coille, Woodhill
|
|
Kinsale
|
|
Tivoli
|
|
Cork
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
John P. O'Flynn
|
Right of way to new access road
|
|
|
Apartment No. 11 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
Michael MacSweeney
|
Cork City
|
|
|
Apartment No. 12 Cois Coille, Woodhill
|
|
|
|
Tivoli
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
New access to Woodhill Villas
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.R.182
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 7
|
Property Plan
|
|
001
|
|
Land over which rights including rights of way and other rights and easements are to be
|
|
|
|
|
acquired
|
Property Number
|
|
R.184
|
|
|
|
|
|
|
|
| |
Situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Situation
|
Joe Neville & Sons Limited
|
|
|
Woodhill, Tivoli, Cork
|
Mansfield House, Mansfield Lands,
|
|
|
|
Kinsale
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Right of way to new access road
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.R.184
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 7
|
Property Plan
|
|
001
|
|
Land over which rights including rights of way and other rights and easements are to be acquired
|
Property Number
|
|
R.188
|
|
|
|
|
|
|
|
| |
Situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Situation
|
Cork City Council
|
|
|
Lower Glanmire Road, Cork
|
City Hall
|
|
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Right of way to new access road
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
001.R.188
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 7
|
Property Plan
|
|
005
|
|
Land over which rights including rights of way and other rights and easements are to be acquired
|
Property Number
|
|
R.17
|
|
|
|
|
|
|
|
| |
Situation of Land
|
OWNERS OR REPUTED OWNERS
|
LESSEES OR REPUTED LESSEES
|
OCCUPIERS
|
Situation
|
Patrick Joseph Walsh
|
|
|
Killacloyne, Glounthaune, Co. Cork
|
Killahora
|
|
|
|
Glounthaune
|
|
|
|
Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Description
|
|
|
|
Right of way to install and maintain culvert
|
|
|
|
through field
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
|
|
Killacloyne
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
|
| |
|
|
|
|
|
|
|
Date:
|
20/04/2006
|
Ref. No:
|
005.R.17
|
|
|
|
|
|
|
|
|
| |
|
| |
SCHEDULE 8
|
|
Article 14(1)
|
|
| |
Part 1: Public rights to be extinguished
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 1
|
Property Plan
|
|
012
|
|
Public rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
B.507
|
|
|
|
|
|
|
|
| |
Situation of Land over which rights may be claimed to exist
|
|
OWNERS OR REPUTED OWNERS
|
|
Description
|
|
Closure of level crossing
|
Cork County Council
|
|
County Hall
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
Situation
|
|
Ballyrichard More, Midleton, Co. Cork
|
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
Ballyrichard More
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by new access roadway
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
012.B.507
|
|
|
|
|
|
|
|
|
| |
|
| |
Part 2: Private rights to be extinguished
|
|
Article 14(1)
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.513
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Denis Dennehy
|
Lower Glanmire Road, Cork
|
Myrtle Hill House, Lovers Walk
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
Margaret Corcoran 1 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
Description
|
|
Closure of level crossing
|
Jennifer Dennehy and Leonard Twomey
|
|
1a The Lodge, Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.513
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.513
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Meta and May Prendergast
|
Lower Glanmire Road, Cork
|
2 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
Thomas O'Halloran
|
|
3 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
Description
|
|
Closure of level crossing
|
|
|
Owen McIntyre
|
|
4 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.513
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.513
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Dermot F. and Bernie Walsh
|
Lower Glanmire Road, Cork
|
5 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
Frank and Rhona O'Sullivan
|
Description
|
7 Myrtlehill Terrace
|
Closure of level crossing
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
William Crowley and Neasa O'Riordan
|
|
6 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.513
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.513
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Geraldine O'Neill
|
Lower Glanmire Road, Cork
|
8 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
Violet M. Evans
|
|
10 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
Description
|
|
Closure of level crossing
|
|
|
Alan Murphy and Lisa Bolger
|
|
9 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.513
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.513
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Eugene and Suzanne Buckley
|
Lower Glanmire Road, Cork
|
11 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
Adrian and Denise Connolly
|
|
12 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
Description
|
|
Closure of level crossing
|
|
|
Sean and Mandy Young
|
|
13 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.513
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.513
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Gerry O'Neill
|
Lower Glanmire Road, Cork
|
14 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
Peter Scannell
|
|
15 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
Description
|
|
Closure of level crossing
|
Patrick Zuk and James Barry
|
|
16 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.513
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.513
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Andrea Caulfield
|
Lower Glanmire Road, Cork
|
17 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
Mary Wilson
19 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
Description
|
|
Closure of level crossing
|
|
|
Ann Murphy
|
|
18 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.513
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.513
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Joe Kelly
|
Lower Glanmire Road, Cork
|
20 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
|
Ann M. Cantwell
|
|
21 Myrtlehill Terrace
|
|
Tivoli
|
|
Cork
|
|
|
|
|
|
|
Description
|
|
Closure of level crossing
|
|
|
Paddy O'Reilly
|
|
Henchy's Bar
|
|
St. Lukes Cross
|
|
Cork
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.513
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.514
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Peter and Gaye Haughton
|
Lower Glanmire Road, Cork
|
The Coach House
|
|
Lower Glanmire Road
|
|
Cork
|
|
|
|
|
|
|
|
David and Jacqueline Foley
|
|
1 Bellevue Villas
|
|
Lower Glanmire Road
|
|
Cork
|
|
|
|
|
|
|
Description
|
|
Closure of level crossing
|
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.514
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.514
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Janice and Michael Kellegher
|
Lower Glanmire Road, Cork
|
2 Bellevue Villas
|
|
Lower Glanmire Road
|
|
Cork
|
|
|
|
|
|
|
|
Barry and Michelle Manze
|
|
3 Bellevue Villas
|
|
Lower Glanmire Road
|
|
Cork
|
|
|
|
|
|
|
Description
|
|
Closure of level crossing
|
|
|
|
|
|
|
|
Townland
|
|
Cork City
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
Observations
|
Referenced By:
|
A.R.
|
|
To be replaced by overbridge
|
|
|
|
|
| |
|
Date:
|
20/04/2006
|
Ref. No:
|
001.E.514
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
Glounthaune to Midleton - BOOK OF REFERENCE - SCHEDULE 8 PART 2
|
Property Plan
|
|
001
|
|
Private rights to be extinguished
|
|
|
|
|
|
Property Number
|
|
E.515
|
|
|
|
|
|
|
|
| |
|
| |
Situation of Land
|
|
Person(s) Entitled To Right
|
|
Situation
|
Winifred Creedon
|
Lower Glanmire Road, Cork
|
1 Woodhill Villas
|
|
Lower Glanmire Road
|
|
Cork
|
|
|
|
|
|
| |