| |
SCHEDULE.
|
| |
1. Brake levers on both sides of waggons.
|
| |
2. Labelling waggons.
|
| |
3. Movement of waggons by propping and tow roping.
|
| |
4. Steam or other power brakes on engines.
|
| |
5. Lighting of stations or sidings where shunting operations are frequently carried on after dark.
|
| |
6. Protection of point rods and signal wires, and position of ground levers working points.
|
| |
7. Position of offices and cabins near working lines.
|
| |
8. Marking of fouling points.
|
| |
9. Construction and protection of gauge glasses.
|
| |
10. Arrangement of tool boxes and water gauges on engines.
|
| |
11. Working of trains without brake vans upon running lines beyond the limits of stations.
|
| |
12. Protection to permanent way men when relaying or repairing permanent way.
|