Dublin United Tramways (Lucan Electric Railways) Act, 1927

Construction of railway in Chapelizod.

10.—The railway in Chapelizod from the present crossing near the Chapelizod Gate of the Phoenix Park shall be constructed on the southern side of the roadway on a raised platform as far as the bend opposite the Mullingar Arms licensed premises and thence shall be constructed level with the roadway as far as the city boundary and the alignment of same shall be to the satisfaction of the Borough Surveyor. The passing place on this section of the railway shall have its northern side constructed at road level to the satisfaction of the Borough Surveyor. The Corporation shall lay and maintain the surface pavement of the portion of the railway between the bend aforesaid and the northern side of the bridge over the River Liffey and the Company shall provide and maintain the necessary foundations to the satisfaction of the Borough Surveyor. The Company shall remove the existing railway from and including the road crossing opposite or near the Chapelizod Gate of the Phoenix Park to the termination of the crossing place opposite the Mullingar Arms licensed premises. The work shall be completed to the satisfaction of the Borough Surveyor but the Corporation shall be responsible for the making good at their own expense and free of charge to the Company of the road surface left uncovered or torn up by the removal of the railway and platform from the present position.