S.I. No. 73/1929 - The Shannon Works Transfer (No. 11) Order, 1929.


STATUTORY RULES AND ORDERS. 1929. No. 73.

THE SHANNON WORKS TRANSFER (No. 11) ORDER, 1929.

The Shannon Works Transfer (No. 11) Order, 1929, dated the twenty-third day of December, 1929, made by the Minister for Industry and Commerce, pursuant to sub-section (1) of Section 17 of the Electricity (Supply) Act, 1927 .

WHEREAS it is enacted by sub-section (1) of Section 17 of the Electricity (Supply) Act, 1927 (No. 27 of 1927), that when the Shannon Works are completed and handed over to the Minister for Industry and Commerce by the Contractor engaged in the construction thereof the said Minister shall, as soon as conveniently may be, by order under his seal hand such works over to the Electricity Supply Board, and, in the event of any portion of the Shannon Works being completed and handed over to the said Minister by the said Contractor, the said Minister may if he so thinks fit at any time thereafter by order under his seal hand over to the said Board such completed portion of the paid works at any time before the completion of the whole of the said works:

AND WHEREAS the portion of the Shannon Works more particularly described in the Schedule hereto has been completed and handed over to the said Minister by the Contractor engaged in the construction thereof:

AND WHEREAS in the opinion of the said Minister it is expedient that the said portion of the Shannon Works should be handed over to the said Board as from the date of this Order.

NOW THEREFORE I, PATRICK McGILLIGAN, Minister for Industry and Commerce, in exercise of the powers conferred on me by sub-section (1) of Section 17 of the Electricity (Supply) Act, 1927 (No. 27 of 1927), and of every and any other power me in this behalf enabling do hereby order as follows, that is to say:

1. This Order may be cited for all purposes as the Shannon Works Transfer (No. 11) Order, 1929.

2. The Interpretation Act, 1923 (No. 46 of 1923), applies to the interpretation of this Order in like manner as it applies to the interpretation of an Act of the Oireachtas.

3. The portion of the Shannon Works more particularly described in the Schedule hereto shall be, and it is hereby, handed over as from the date of this Order to the Electricity Supply Board.

SCHEDULE.

I.—No. 3 Transformer Stations 38/10 Kv, complete with Transformers, switchgear, apparatus and equipment, buildings, station enclosures, fencing and other ancillary works situated at:—

Swords

Balbriggan

Drogheda

and set out on the plan annexed hereto.

II.—No. 82.29041 Km of 38 Kv Transmission Lines erected complete with foundations, poles, insulators, conductors connected to the Transformer Stations specified in this Schedule and set out on the plan annexed hereto.

III.—No. 62.5566 Km of 10 Kv Transmission Lines erected complete with foundations, poles, insulators, conductors, connecting the undermentioned towns:—

Swords—Rush—Lusk

Swords—Malahide

Navan—Kells

Navan—Trim—Athboy

and set out on the plan annexed hereto.

IV.—No. 11.4407 Km of 10 Kv Transmission Lines complete erected with foundations, poles, insulators, conductors, connecting with the undermentioned towns:—

Swords

Drogheda

Balbriggan

Navan

and set out on the plan annexed hereto.

Dated this 23rd day of December, 1929.

(Signed), PATRICK McGILLIGAN,

Minister for Industry and Commerce.

(Signed), GORDON CAMPBELL,

Secretary,

Department of Industry and Commerce.