|
State contribution to the cost of drainage scheme.
|
14.—(1) At such time or times during the carrying out of a drainage scheme or within three months after the completion of such carrying out has been certified under this Act as the Minister for Finance shall direct there shall be paid out of moneys provided by the Oireachtas such sum (in this Act referred to as the State grant) in respect of such drainage scheme as the Minister for Finance shall sanction not exceeding whichever of the following amounts shall be the lesser, that is to say, one-fourth of the total cost of carrying out such drainage scheme or the sum of two hundred and fifty pounds.
|